/
  • Filings

Public Utility Commission of Texas Filings

Project No. 53403

Grid United filed comments with the Public Utility Commission of Texas in response to a request to comment on how to better incentivize resiliency and reliability projects. Grid United is supportive of the Commission’ s efforts to provide ERCOT with additional tools to incentivize projects, like Pecos West, that are critical for the ongoing reliability and resiliency of the Texas Grid, and which also have significant consumer benefits.

File Stamp: 7/8/22

Filing Party: Grid United

 

READ MORE

Docket No. 53758

Grid United Texas filed with the Public Utility Commission of Texas for the Pecos West Intertie Project, a grid strengthening transmission project providing significant reliability, resiliency, and economic benefits to Texans within the Electric Reliability Council of Texas (ERCOT) and El Paso. The Pecos West project consists of two proposed 1,500 MW, high-voltage direct current converter stations in the West Texas region of ERCOT (near Bakersfield) and El Paso in the Western Electricity Coordinating Council (WECC), bridging two key Texas markets and delivering next generation enhancements to the state’s electric infrastructure. The HVDC converter stations will be connected by an approximately 250-300 mile HVDC intertie line. At 1,500 MW, Pecos West will provide more capacity to import power into the ERCOT region from other grids at times of scarcity than all of the currently existing Texas direct-current ties combined. Grid United Texas is seeking a determination by the PUC that the project is in the public interest and that the public convenience and necessity support the interconnection, permitting the project to proceed through additional federal and state approval processes. Grid United Texas will obtain all necessary approvals from the Federal Energy Regulatory Commission to ensure ERCOT’s jurisdictional status quo as part of its future regulatory filings.

File Stamp: 7/5/2022

Filing Party: Grid United Texas LLC

 

READ MORE

Docket No. 53169

Grid United filed comments with the Public Utility Commission of Texas in response to proposed changes to transmission service charges for exporting power outside the ERCOT region. Grid United filed in support of the Public Utility Commission’s proposal to reduce export charges in ERCOT. ERCOT currently has five inter-ties to neighboring grids providing limited import and export capabilities.

File Stamp:   3/3/2022

Filing Party:   Grid United LLC

 

READ MORE

File Stamp:   3/14/2022

Filing Party:   Grid United LLC

 

READ MORE

Project No. 53169

Grid United filed comments with the Public Utility Commission of Texas in response to the request for comment by the Staff of the Public Utility Commission of Texas regarding  export tariff rulemaking.  As the nation’ s largest producer of fossil fuels and renewable energy, Texas should build on its lead by encouraging the responsible export of its natural resources.

File Stamp: 9/1/22

Filing Party: Grid United

READ MORE